The Peace River Bridge will be reduced to one lane on March 17th and 18th. Bridge inspection crews will be doing overhead inspections of the bridge, and the remaining lane will be controlled by traffic lights to accommodate alternating traffic. The work takes place from 7 A.M. to 6 P.M. both days.